Due to the age of the equipment, the plumbers have been delayed fetching different sized connectors.
The valve is ready to be connected once they return, eta 30 minutes.
Due to the age of the equipment, the plumbers have been delayed fetching different sized connectors.
The valve is ready to be connected once they return, eta 30 minutes.
Thursday 20th March
10:30am
Approx 1 hour
The mains water valve at the front of the building is scheduled for replacement.
This will necessitate shutting off water to the whole building for approximately 1 hour.
Updates will be posted here in the event of any delays.
Contact Reeve at 0467444074 with any questions or concerns.
I have 2 tickets for The Removalists tonight 630pm session at Southbank Theatre
We can’t use them
Send me an email – buckgw@gmail.com
A number of you have raised the issue with the noise coming from generators in Bowen Lane for the Ramsay Clinic. The generators were an emergency installation following a major flood.
We received this update today
—-
Hi Neighbours
I have an update on our power situation for you all. While not a final resolution date, we have made significant progress in approvals and planning since I was last in touch.
I know with the warm weather there has been an increase in the load on the generators and also the impact of the noise from doors and windows being open. You may recall that we had to decrease the acoustic blankets around the compound due to the heat leading to the generators overheating and failing. We are sorry for this ongoing noise but we are doing our best ot balance the stability of power for the hospital with the noise of the generators. We have had Worksafe out to review twice in the past 3 weeks and they have advised that the decibel readings are within acceptable levels and our emergency situation as a health care facility allows us to run them in this configuration. The decibel readings are all under 85 within the immediate vicinity of the generators, on the footpath and at the building boundary, which is where Worksafe took their readings from.
I can advise that our new switchboard is now in build mode with the estimated build time 4-5 weeks. This means that we are busily planning to return the site to mains power supply as soon as the board is installed. At this point we are looking at a window in the 2 weeks post Easter, but a final date will not be known until we have a final build completion date for the switchboard itself and approval from Citipower to re-activate the sub-station. We have commenced work with Citipower already to expedite their works to enable us to switch across.
I will keep you all informed as we progress to a set date for the transition to occur but we are now well on the way to being able to remove the generators from site.
I am at a conference next week so will have intermittent access to email but please don’t hesitate to reply and I will do my best to respond in a timely manner.
Please share this information with your residents / neighbours as per my previous correspondence.
Thank you
Petra
Petra Glare
CEO
Do you live near Albert Park? Did you know you could attend the Grand Prix for free on Thursday 13 March?
The Australian Grand Prix Corporation are offering free Park Pass tickets to the local community – including free access to all grandstands.
All you have to do is present a valid ID (or utility bill and ID) with the address of your residence or business within the following postcodes:
3182
3205
3206
3004
The Park Pass tickets can be redeemed on Thursday 13 March at gates 2, 3, 5, 8, and 10 – tickets are one per person living at address and subject to availability.
For more information follow the below link and see under the Community Day drop down. https://bit.ly/4hrRrbS

Dear Residents and Tenants,
We are excited to announce a series of events, Live at the Gardens, taking place on the Observatory lawns in the Botanic Gardens precinct over two weekends: Friday, March 7th, Saturday, March 8th &
Sunday, March 9th, as well as Friday, March 14th & Saturday, March 15th, 2025.
Please be aware that noise levels will be monitored for this event and will adhere to regulatory requirements.
Amplified Sound Schedule:
Hello all,
Follow the link below to register any concerns with the project management
https://app.smartsheet.com/b/form/c717977ddaac46d1b27ea6effca873ff
Façade B (North face)
On Monday 3rd March access to the lower carpark will be blocked
between 9am-4.30pm to enable erection of scaffolding. If you do need
to use your vehicle, please ensure this is removed from the carpark
prior to 8.30am.
We expect to commence painting works on this façade next week
following the scaffolding erection.
Façade D (Bowen Cres):
Next week, Avello will complete the washing to Façade D and commence
painting works.
Please ensure all windows and doors are closed for the duration of the
painting works.
More info is available at the Resident Meetup at Flo’s 412 St Kilda Rd on Wednesday March 5th, 5:30pm-7:30pm
RSVP is not necessary to attend but please inform Reeve or Margaret at knurekmusic@gmail.com
So that appropriate catering can be organized.
You must be logged in to post a comment.