It was a short week, both with the long weekend and the delays caused by wet weather. Things have ramped back up and the team is ready for another big week in Domain.

  1. Albert Road legacy construction

Due to the weather this week, the Albert forecourt works we mentioned last week will now happen next week. On Wednesday night (11/10) we will have a crane working for an hour or so on St Kilda Road to move barriers to implement a new construction access gate.

In the linear park, we are about to pour the remainder of the local access road heading from The Domain towards the legacy east /west bound alignment (marked below in orange). This will either happen tomorrow or on Monday. In the park, paving and finishes continue.

  1. Albert Road Reserve Station Entrance

Crews are continuing to work until 1am in the station entrance to install the reinforcement for the stairs, internal walls and roof. Below is a picture of the scaffolding for the roof reinforcement and the reinforcement for the stairs.

  1. Station Fitout

Flooring and fitout continue within the station.

  1. Shrine Entrance

The Shrine entrance team have made some great progress in the last few weeks and have largely finished the escalator structures.

  1. St Kilda Road – Bowen Lane to Bowen Crescent (Night work reminder)

The storm water works should be completed by tomorrow at Bowen Lane, this will be followed by the remainder of the gas and sewer connection. Later we will install of the strata vault, kerbs, footpath and road ways.  Thursday night next week, a crew will work an extended shift to install the architectural features on the inlet exhaust in the median, this should only take a few hours once St Kilda Road is closed (more info on that below).

Installation of the water valve will happen within our site, opposite Bowen Lane on the Melbourne Grammar School side on Thursday night (12/10). In the monthly construction update, you would have seen this as a few nights of work but it will just take one. These works involve non-destructive digging, hand tools and potentially some minor asphalting. These works will impact water supply (which is why it is taking place at night), South East Water will contact those who are affected.

  1. St Kilda Road Bowen Crescent to Toorak Road


Northbound Side (Towards City)

On Thursday night, there will be a northbound closure of St Kilda Road so that we can remove the construction barriers from The Lucient building south of Toorak Road to Bowen Cresent and opening the new separated bike lanes through this section.

Southbound side (Away from City)

On Wednesday night, the some of the concrete barriers from Bowen Crescent to the northern pedestrian tram stop crossing will be removed. Works will continue in the southern section towards Toorak Road.

Also, as a quick FYI – there will be a few other organisations working in the area next week. Telstra will start next week to install their communications bank on the Shrine side from Park Street to Domain Road. Trees will also be planted by a separate contractor next week around the Park St intersection.

Have a great weekend all,

Rob and Remy

Good news on insurance

Thanks to all who participated in the ‘plumbing checks’ and an extra thanks to those who have already done their remediations.

We have renewed our insurance with only a very modest increase AND have been able to reduce our flood excess from $10000 to $5000.

The figure of $5000 is still a big chunk of cash for any of us to find if you flood your apartment and it damages common property or other apartments….so please be careful.

CYP week ahead

Good afternoon everyone,

For the Collingwood Magpies, Brisbane Lions, Penrith Panthers and Brisbane Broncos fans reading this, best of luck to you over the weekend!

While it’s a big weekend for sport, it will be quiet on site with works not returning until Tuesday 3 October.

  1. Albert Road legacy construction

Next week works on the Albert Reserve Forecourt will begin. This is the area between the current entrance construction and the Albert Road / St Kilda Road intersection. On Wednesday night (4/10) we will have a crane working for an hour of so on St Kilda Road to move some of the barriers to implement a new construction access gate. Soft and hard landscaping will continue closer to Kings Way.

  1. Albert Road Reserve Station Entrance

This week, crews have been working up to 1am in the Albert Road entrance. After 10pm, works are significantly reduced to below road level with hand tools only. These 1am finishes will continue into next week and until the roof slab in poured later next month.

  1. Station Fitout

I hope you enjoyed the photos from last week, not much further to update here.

  1. Shrine Entrance

The backfilling and breakout of the logistic void is now complete. The drainage and services crews will mobilise starting next week. Steel fixing and pours continue within the station entrance.

  1. St Kilda Road – Bowen Lane to Bowen Crescent

Still no update on the reopening of Bowen Lane.  Remaining works include the installation of the strata vault, kerbs, footpath and road ways.  Next week City of Melbourne will be in to plant the next batch of trees in the median across from Melbourne Grammar School. Once this section is planted and landscaped we should be able to remove the barriers through this section and we’re also looking to open the legacy parking that will be in place in front of Melbourne Grammar. We’ll confirm once we have a date for this barrier removal and line marking.

  1. St Kilda Road Bowen Crescent to Toorak Road


Northbound Side (Towards City)

This section is very near to completion with just the final touches remaining on the installation of the separated bike lanes. The smaller site south of Kings Way/ Toorak Road is on track to reopen in Mid-October.

Southbound side (Away from City)

The pedestrian crossing near the Royce to the tram stop has now reopened and today the crews were in place doing the last of the works on the pesky gas line that was at the wrong height.  As mentioned previously, this will enable the crews to head to the southern end of this section at Toorak Road and begin the installation of the drainage working their way back towards the city. The pedestrian crossing at from Subway to the tram stop will close for about a week to let these works safely take place as we install the new drainage across the ped crossing. We are working away to be out of this area by the end of October.