18 October 2022
TO THE RESIDENT / TRADER
412 St KILDA ROAD, MELBOURNE
NOTIFICATION OF FULL ROAD CLOSURE
BOWEN CRESENT/ QUEENS LANE INTERSECTION TO ST KILDA ROAD/ BOWENS CRESENT INTERSECTION.
Date: 24/10/2022 – 25/10/2022
You are advised that the associated building works need to occur on with a dry run involving a crane set up on 24/10/2022 – 25/10/2022 from 7am till 7pm and as such this notice serves as information of the likely impact of this activity.
These works are a component of the refurbishment at 412 St Kilda Road. The works involve the use of a mobile crane operating from 7am – 7pm and will result in a full road closure. The machinery will operate for 2 days.
In case of inclement weather or delays, if we are not able to set up up on these dates the set up may occur on 26/10/2022 and 27/10/2022
Although the works are substantial, every very effort will be made to minimize impact to businesses and the general public. The following treatments will apply:
• Pedestrian access will be maintained via opposite footpath(s)
• Access to building car parks are to be maintained
• Access to all properties will be maintained.
The refurbishment works for this site was never going to be an easy task however, the contractor will attempt to minimize the impact of these building works and apologises for any inconvenience that may be caused.
Although the works will be difficult for local traders and residents, your co-operation will be greatly appreciated.
Thank you.
Daily FDC contact:
Jake Harry 0438 069 187