Driveway news

Good afternoon everyone,


I finally have a have some good news on the works out the front of Botanica.

Originally scheduled to finish on the 13 May – we are going to have the works complete and the driveway reopened this Thursday evening, (4 May)

It will likely reopen at the end of the shift, at 6pm – but may be earlier if everything goes to plan.

The only thing that might trip us up is the weather – but the forecast is looking good so far.

 

A few things to note:

 

  • The Botanica driveway entry/exit during this next stage will be via St Kilda Road – not Bowen Lane as previous
  • Your Ace/Nation parking passes will remain active until 13 May. Feel free to use them for any family/visitors up until that point
  • When you’re done with your pass – If you can pop them into the mail slot on Paul’s office (Building Manager)
  • We’ve got some line-markers working in Albert Road overnight – I’ll get them to swing by and linemark the Botanica driveway at the end of their shift
  • Bowen Lane will be closed at St Kilda Road at the same time – It doesn’t directly relate to the driveway, but just thought I’d flag this, as it does change your access to Kings Way southbound.

 

Lastly, A huge, huge thankyou to everyone for being patient and understanding during these works.

Working with Ace Parking was very challenging, and Nation Parking occasionally had their hiccups as well – my apologies that the pass system wasn’t as smooth as I would have liked, but again, a massive thanks to everyone for bearing with me while we ironed out the kinks.

I’ll be in touch tomorrow to confirm the reopening time.

 

Thanks, Rob

Advertisement

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s