Any feedback on building washdown?

The guys washing the building should have completed the back by Easter.  They will then do the Bowen Crescent side.

The photo below seems to show that the result is noticeably better, but not as good as a repaint.  The right side has been done, the left still to be done.

20160320_132543

Any feedback?

 

Advertisement

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s