TO THE RESIDENT / TRADER
412 St KILDA ROAD, MELBOURNE
NOTIFICATION OF FULL ROAD CLOSURE
BOWEN CRESENT/ QUEENS LANE INTERSECTION TO ST
KILDA ROAD/ BOWENS CRESENT INTERSECTION.
Date: 03/11/2022
You are advised that the associated building works need to occur on with a dry run
involving a crane set up on 03/11/2022 from 7am till 6pm and as such this notice
serves as information of the likely impact of this activity.
These works are a component of the refurbishment at 412 St Kilda Road. The works
involve the use of a mobile crane operating from 7am – 6pm and will result in a full
road closure. The machinery will operate for 1 day – During normal construction
hours.
In case of inclement weather or unforeseen delays, if we are not able to set up on
these dates the set up may occur on 26/10/2022 and 27/10/2022
Although the works are substantial, every very effort will be made to minimize impact
to businesses and the general public. The following treatments will apply:
• Pedestrian access will be maintained via opposite footpath(s)
• Access to building car parks are to be maintained
• Access to all properties will be maintained.
The refurbishment works for this site was never going to be an easy task however,
the contractor will attempt to minimize the impact of these building works and
apologises for any inconvenience that may be caused.
Although the works will be difficult for local traders and residents, your co-operation
will be greatly appreciated.
Thank you.
Daily FDC contact:
Jake Harry 0438 069 187