You should have received letterbox notification that the St Kilda Rd driveway will be unavailable tomorrow for thirty minutes. It will occur between 10-11am
All posts by Gary Buck
City of Port Phillip – CEO report
I’ve only had a quick skim, but LOTS of good info in here. It will be tabled at tonight’s council meeting
E122476_17__CEO_Report_-_Issue_37(2)
If you are really keen you can watch tonight’s council meeting on your PC. Here is the link.
What’s the link between Tiger win and Botanica??
Some of you may not realise but both the captain (Trent Cotchin) and Shane Edwards lived at Botanica at one time.
Another Tiger captain, Kane Johnston also lived here.
Well done Tigers
No access via St Kilda Rd driveway on Thursday
As indicated last week, we will have no access in or out of our St Kilda Rd driveway between 9am – 4pm on Thursday October 5.
We also need to carry out some rollerdoor repairs and are trying to do both at the same time
Details are here

Comms work update
The sad state of our footpath will improve over the next 10 days. Next week they will backfill most of the trenches, leaving two smallish holes.
They are trying to re-instate our parking bays as soon as possible – my guess is the end of next week.
You should also be aware that there will be quite a lot of action in Bowen Cres over coming weeks.
- Monday Oct 2 – Westbound traffic stopped for gas commissioning
- Mid-Oct to mid-Dec (my guesses) – they need to make two pits in Bowen Cres, near St Kilda Rd. From those pits they will push drainage and sewer pipes under St Kilda Rd. Will be done during the day and the company contracted to do the work has converted all their vehicles from reversing beepers to less intrusive squawkers
We do NOT expect any driveway access issues in Bowen Cres – you may need to patiently wait for the traffic control to let you through.
Gas back – next week we lose our Driveway for the day
I’ve done exhaustive testing – our apartment – and it seems we have the gas back on. If you drive down Bowen Crescent you may have noticed the discreet newly located gas meter!! MMRA have agreed to fund some garden work to help camouflage the monstrosity.

Confirmation will come out on Monday but it seems that we will lose access to our St Kilda Rd driveway on Thursday October 5, from 9am – 4pm.
If you need to park in the Bowen Cres multi-storey park, you can claim the cost back from MMRA – see details below

No gas on Thursday at Botanica
As they are cutting us over from the old to the new system on Thursday September 28, we will have an outage from 9am – 4pm
As I understand everyone has electric hot water – so it should be low impact
Update on Gas and Comms work
As the residents of Botanica will have noticed, there is lots of work happening. The current plan (subject to change of course) is as follows:
- Gas work next to the Bowen Cres driveway will be done this week.
- Involves laying a concrete slab, installing a meter and cage
- Garden will be re-instated at the end, as best it can be
- We are likely to have a gas outage on Thursday during the day
- Comms work under footpath
- Most of the ‘work’ should be done by the end of this week
- Footpath re-instatement should be done by end of next week
Gas outage for Botanica
We have received this notification
Please be advised that the gas supply will be curtailed for a period of approximately 2 hours, next week between Tuesday and Friday, I will notify you when the works schedule is firmed up.
Paul is asking for clarification
Lap Pool for Botanica?
See attached
You must be logged in to post a comment.